010000 - General Requirements

010000S01 Special Conditions - CM at Risk
09/2024
All Projects
010000S01 Special Conditions - General Contractor
09/2024
All Projects
010000S02 Tree Protection Standards
05/2017
All Projects
010000S03 Medical Center Project Manual for GC
9/2021
MedCen/Hosp only
010000S04 Medical Center Project Manual for CM at Risk
9/2021
MedCen/Hosp only
010000S05 Confined Space Entry
12/2015
MedCen/Hosp only
010000S06 Energy Lockout / Tag Out
12/2015
MedCen/Hosp only
010000S07 Utility Outages for Renovation and Construction Projects
12/2015
MedCen/Hosp only
010000S08 Bypassing Fire Alarm System Points – Medical Center
12/2015
All Projects
010000S09 Greek Park Standards
07/2018
All Projects
013223S01 Survey and Layout Data - Field Engineering Survey Standards
12/2015
All Projects
013316S01 Design Data Parapet Walls
12/2015
MedCen/Hosp only
013316S02 Design Data Work Above Ceilings
12/2015
All Projects
013316S03 Golf Carts and Utility Vehicles
12/2015
All Projects
013529S01 Health, Safety, and Emergency Response Procedures - Fire Response Procedures
12/2015
All Projects
014000S01 Quality Requirements Design Guidelines
12/2015
All Projects
014000S02 Quality Requirements Design Qualities
12/2015
All Projects
014000S03 Quality Requirements Design Principles
12/2015
All Projects
014000S04 Quality Requirements Guidelines for Rehabilitation
12/2015
All Projects
014000S05 Office/Workstation Space Guidelines for Academic, Research and Academic Support Functions
03/2024
Academic/ Workstation & Academic Support Functions
014000S06 Quality Requirements Post Occupancy Roof Fall Protection
12/2015
All Projects
014100S01 DHBC Code Review Agreement on projects up to $1,000,000 scope
12/2015
All Projects
014100S02 American Disability Act Accessibility Guidelines (ADAAG)
12/2015
All Projects
014219S01 Reference Standards: Laboratory Design Guidelines
12/2015
All Projects
014219S02 Reference Standards: Safety Standards for Chemical Laboratories
12/2015
All Projects
014219S03 HBC waiver to use NFPA Chemical Storage Limits
12/2015
All Projects
014219S04 Technical and Performance Standards: Fume Hood Systems
12/2015
All Projects
014219S05 Reference Standards: Explanation for Solvents in Laboratories
12/2015
All Projects
014500S01 Quality Control: Plumbing Inspection and Water Sample Report
12/2015
All Projects
014500S02 Quality Control: Electrical Inspection
12/2015
All Projects
014500S03 Quality Control: Air Systems Testing, Adjusting and Balancing
12/2015
All Projects
015116S01 Temporary Heat Detection for Construction & Maintenance Activities
08/2019
MedCen/Hosp only
015119S01 TEMPORARY FUEL OIL: Spill Prevention Information
12/2015
All Projects
015126S01 TEMPORARY LIGHTING: Lighting Contactors - Outside Light Control and Wiring
12/2015
All Projects
015600S01 Temporary Barriers and Enclosures - Temporary Partitions
12/2015
All Projects
015626S01 Temporary Fencing - Performance Standard for Construction Site Fencing
12/2015
All Projects
017413S01 Progress Cleaning- Mechanical Piping Construction Cleaning
12/2015
All Projects
017800S01 Closeout Submittals
1/2022
All Projects
017900 Demonstration and Training
03/2024
All Projects
018100 Facility Performance Requirements, Single User Restrooms
09/2020
All Projects