Skip To Content
People
Map
Close
myUK
Menu
<< Facilities Main
Mission Statement
Construction Map
Official Design Standards
All available standards
Division 00 - Procurement and Contracting Requirements
Division 01 - General Requirements
Divisions 02 - 19 - Facility Construction
Divisions 20 - 29 - Facility Services
Divisions 30 - 39 - Site and Infrastructure
Divisions 40 - 49 - Process Equipment
Updated within last 12 months
Updated within last 6 months
Live Project Cameras
Interior Design
Services
Projects
Contacts
UK Campus Planning
Staff Directory
Directions to Office
Frequently Asked Questions
Close
Capital Project Management Division
Home
/
Divisions 20 - 29 - Facility Services Subgroup
/ 230000 - Heating, Ventilating and Air Conditioning (HVAC)
230000 - Heating, Ventilating and Air Conditioning (HVAC)
236000S01 CENTRAL COOLING EQUIPMENT - Secondary Chilled Water Pumping with Return Chilled Water Temperature Control for Campus Buildings (Ameresco)
Read more
about 236000S01 CENTRAL COOLING EQUIPMENT - Secondary Chilled Water Pumping with Return Chilled Water Temperature Control for Campus Buildings (Ameresco)
236000D01 CENTRAL COOLING EQUIPMENT Secondary Pumping
Read more
about 236000D01 CENTRAL COOLING EQUIPMENT Secondary Pumping
235200S01 HEATING BOILERS - Inspection Certificates
Read more
about 235200S01 HEATING BOILERS - Inspection Certificates
234100S02 PARTICULATE AIR FILTRATION - Prefilters
Change only to title/spec # to match doc name - S02
Read more
about 234100S02 PARTICULATE AIR FILTRATION - Prefilters
234100S01 PARTICULATE AIR FILTRATION - Final Filter – Rigid Type
Read more
about 234100S01 PARTICULATE AIR FILTRATION - Final Filter – Rigid Type
233816N01 - NOTES FOR DRAWING 233816D01
Read more
about 233816N01 - NOTES FOR DRAWING 233816D01
233816D04 FUME HOODS - Ductwork Detail
Read more
about 233816D04 FUME HOODS - Ductwork Detail
233816D03 FUME HOODS - EXHAUST DETAILS
Read more
about 233816D03 FUME HOODS - EXHAUST DETAILS
233816D01 FUME HOODS - EXHAUST DETAILS
Read more
about 233816D01 FUME HOODS - EXHAUST DETAILS
233300S02 AIR DUCT ACCESSORIES
Read more
about 233300S02 AIR DUCT ACCESSORIES
Pages
« first
‹ previous
1
2
3
4
5
6
next ›
last »
<< Facilities Main
Mission Statement
Construction Map
Official Design Standards
All available standards
Division 00 - Procurement and Contracting Requirements
Division 01 - General Requirements
Divisions 02 - 19 - Facility Construction
Divisions 20 - 29 - Facility Services
Divisions 30 - 39 - Site and Infrastructure
Divisions 40 - 49 - Process Equipment
Updated within last 12 months
Updated within last 6 months
Live Project Cameras
Interior Design
Services
Projects
Contacts
UK Campus Planning
Staff Directory
Directions to Office
Frequently Asked Questions