Skip To Content
People
Map
Close
myUK
Menu
<< Facilities Main
Mission Statement
Construction Map
Official Design Standards
All available standards
Division 00 - Procurement and Contracting Requirements
Division 01 - General Requirements
Divisions 02 - 19 - Facility Construction
Divisions 20 - 29 - Facility Services
Divisions 30 - 39 - Site and Infrastructure
Divisions 40 - 49 - Process Equipment
Updated within last 12 months
Updated within last 6 months
Live Project Cameras
Interior Design
Services
Projects
Contacts
UK Campus Planning
Staff Directory
Directions to Office
Frequently Asked Questions
Close
Capital Project Management Division
Home
/
Divisions 20 - 29 - Facility Services Subgroup
/ 230000 - Heating, Ventilating and Air Conditioning (HVAC)
230000 - Heating, Ventilating and Air Conditioning (HVAC)
232216 - Steam Pressure Reducing Valves
Read more
about 232216 - Steam Pressure Reducing Valves
233600D01 Reheat Coil Piping Schemetic
Read more
about 233600D01 Reheat Coil Piping Schemetic
233600S01 Air Terminal Units
Read more
about 233600S01 Air Terminal Units
230719S01 Piping Insulation, Interior
Read more
about 230719S01 Piping Insulation, Interior
230923.14S01 Flow Metering
Read more
about 230923.14S01 Flow Metering
230620S01 Schedules for HVAC Piping Systems
Read more
about 230620S01 Schedules for HVAC Piping Systems
230913S01 Healthcare Clinical Temperature Humidity Monitoring
Read more
about 230913S01 Healthcare Clinical Temperature Humidity Monitoring
238413S01 AHU Humidification Water Treatment - Monitoring
Read more
about 238413S01 AHU Humidification Water Treatment - Monitoring
230516S01 HVAC Piping Expansion Joints
Read more
about 230516S01 HVAC Piping Expansion Joints
233600S02 Reheat Valves
Read more
about 233600S02 Reheat Valves
Pages
1
2
3
4
5
6
next ›
last »
<< Facilities Main
Mission Statement
Construction Map
Official Design Standards
All available standards
Division 00 - Procurement and Contracting Requirements
Division 01 - General Requirements
Divisions 02 - 19 - Facility Construction
Divisions 20 - 29 - Facility Services
Divisions 30 - 39 - Site and Infrastructure
Divisions 40 - 49 - Process Equipment
Updated within last 12 months
Updated within last 6 months
Live Project Cameras
Interior Design
Services
Projects
Contacts
UK Campus Planning
Staff Directory
Directions to Office
Frequently Asked Questions